LEADBASE:
Bypass the grid.
Deploy high-density
AI-ready data centers
in months, not years.

FlashBuild + modular energy storage delivers turnkey, power-included infrastructure that scales fast—without waiting on the grid.

No Grid Wait
Power Included
Commission in Months

Rapid deployment, self-sufficient data centers—power included.

Fastest Time-to-Power

Prefabricated power and delivery modules ship directly to site, dramatically reducing design and construction timelines.

Exceptional Reliability

Redundant architecture built specifically for high-density, dynamic AI workloads—engineered for uptime when it matters most.

Closed Loop

Minimize dependence on utilities. Operate with resilient on-site power systems designed for independence from the grid.

FlashBuild is a new standard for
data center architecture.

01

Site Selection

Define site requirements, objectives, and delivery timelines. We identify optimal locations that support rapid deployment without grid dependency.

02

Assembly

Prefabricated modules are built in parallel with site work—dramatically compressing the timeline from planning to commissioning.

03

Delivery

Commissioning begins immediately upon delivery—no utility delays, no interconnection queues. You're operational in months, not years.

Power is the bottleneck.
Can you afford to wait for the grid?

Traditional utility interconnection takes years. LEADBASE FlashBuild gets you to power in months—without the queue.

Utility / Grid Interconnection 3–7+ Years
Multi-year permitting, queue, tariffs, upgrades
LEADBASE FlashBuild Months to Power
Months to commission

Eliminate wait on utilities, permitting, and grid tariffs.

Solutions

Purpose-built infrastructure for teams who can't afford to wait.

For Hyperscalers & GPU-Cloud Operators

AI-Ready Data Halls

High-density compute environments designed for AI training and inference at scale—built for GPU clusters and power-hungry workloads.

Request specs
For Teams Blocked by Utility Timelines

Power-Included Deployments

Turnkey infrastructure with on-site power generation. No grid dependency, no interconnection queue—just operational capacity, fast.

Request specs
For Enterprises Scaling AI Workloads

Rapid Expansion Blocks

Modular capacity blocks that deploy incrementally on demand. Scale at your pace, not the grid's.

Request specs

Market Reality

AI demand is outpacing utility timelines.

GPU clusters need power now. Utility companies are years behind the curve—demand is growing faster than grid infrastructure can respond.

Interconnection queues and grid upgrades are a multi-year constraint.

Most interconnection queues now span 3–7 years. Even approved projects face bottlenecks from transmission upgrades, permitting, and tariff negotiations.

Battery-backed on-site power is a proven path to faster time-to-power.

Modular energy storage paired with on-site generation is now mature, cost-competitive, and the fastest path to operational data center capacity.

Newsroom

Let's get to work.

Reserve capacity or talk to our infrastructure team.

Or email us at contact@leadbase.co